
← All stories
Service · Checklist
Service · Checklist
The pre-install site survey checklist
Everything worth checking before a single screen, cabinet or kiosk arrives.

Six things to check on site
01
Power
Sockets, circuits and where the cables will run.
02
Data
Network points where kit will sit, and 4G or 5G signal for the backup line.
03
Mounting
Walls, ceilings and fixtures that can take the load, and the asbestos register before anyone drills.
04
Comms cabinet
Where it lives, whether there is room, and whether it has power and ventilation.
05
Access
Trading hours, install windows and who holds the keys.
06
Photos
Pictures and measurements that save a second visit.


What a survey saves you
Without a survey
- Kit arrives and does not fit
- Engineers waiting on power or data
- A second visit, and a second disruption
With a survey
- Kit specified for the space
- Power and data ready on the day
- Installed in one visit
From walk-round to sign-off
- 1
Book
Agree a time that suits trading.
- 2
Walk
Every position, every route.
- 3
Record
Photos, measurements, notes.
- 4
Design
A plan for the site.
- 5
Sign off
Agreed before anything ships.
Thanks for reading
Want this working on your estate?
Talk to the team that surveys, installs and supports it, across the UK and Europe.

Next story · RetailDigital cabinets versus printed labels: where a screen earns its place














